Archive: Marine Industry (Portfolio Related Tag)

DD Passenger Vessel GR Linkedin Thumb

11

Jul2024
Passenger Vessel DD Project @ Major Greek Shipyard Jul11, 2024Download Maritech was requested to overhaul 2x Fresh Water Distillers units (with a capacity of 80m³/day each) on-board a 1.800 PAX passenger vessel, docked at a major Greek shipyard. Our service team reviewed the equipment’s specifications along with ... Read More
07/11/2024admin
Superyacht Restoration 5

27

Feb2024
SUPERYACHT REPAIR MTU DG LO Cooler Restoration in only 2 days Feb27, 2024Download Maritech’stechnical expertise was requested from the operator of a 12-year-old superyacht regarding a damage issue on one of its MTU Diesel Generator sets. The engine had recently undergone routine overhaul, but while operating leakages ... Read More
02/27/2024admin
DD Dubai Youtube

24

Jan2024

DD Dubai Project

0  
DD Dubai Project Chemical Tanker PHE Overhauling Jan24, 2024Download We were requested to overhaul all coolers of our customer’s 35K Chemical Tanker during her docking at Dubai Dry Docks World, with scope to remove/refit plate packs, renew gaskets and perform in situ press test for two Central ... Read More
01/24/2024admin
Flying Teams 3

15

Oct2023
Flying Teams Project ME LO Cooler Total BreakdownOct 10, 2023 This is a blast from the past case that we wish to share with you. Maritech’s Flying Team of Technicians attended our customer’s idled vessel in the middle of the North Pacific Ocean. The Main Engine’s Lube Oil Cooler ... Read More
10/15/2023admin
Ropax 4

28

May2023
Scheduled In-Situ Maintenance & Upgrade for Multiple Cooler TypesMay 28, 2023Download WE WERE REQUESTED TO CONDUCT IN-SITU INSPECTION, MAINTENANCE & UPGRADE WORKS ON OUR CUSTOMER’S 1700 DWT (1150 PAX) PASSENGER VESSEL’S ME LO AND LT FW COOLERS. INSPECTION: ME LO Coolers findings: • Frame plate corroded at the SW inlet. • ... Read More
05/28/2023admin
In Situ 1

22

Mar2023
Scheduled In Situ Maintenance for Multiple Cooler TypesMar 22, 2023Download WE WERE REQUESTED TO PERFORM PREVENTIVE IN-SITU MAINTENANCE WORKS ON VARIOUS GEA COOLERS TYPES, FOR OUR CUSTOMERS’ RO-RO VESSEL. CONDITION MONITORING OF: • 2 units of LT FW Coolers, consisted of 127pcs of titanium T0.5mm plates • 2 units ... Read More
03/22/2023admin
C

14

Mar2023
Urgent Onboard LT FW Coolers Maintenance5.500 TEU C/V at BesiktasMar 14, 2023Download We were requested to perform an urgent maintenance service operation onboard our customers 5500 TEU lady berthed at Besiktas port, regarding one of her SONDEX S187 LT FW Coolers. Our flying team of experts embarked the ... Read More
03/14/2023admin