Scheduled In Situ Maintenance for Multiple Cooler Types
Mar 22, 2023
WE WERE REQUESTED TO PERFORM PREVENTIVE IN-SITU MAINTENANCE WORKS ON VARIOUS GEA COOLERS TYPES, FOR OUR CUSTOMERS’ RO-RO VESSEL.
CONDITION MONITORING OF:
• 2 units of LT FW Coolers, consisted of 127pcs of titanium T0.5mm plates
• 2 units of Jacket HT Coolers, consisted of 92pcs of titanium T0.5mm plates
• 2 units of LO Coolers, consisted of 121pcs of AISI T0.5mm plates
WORK SCOPE:
• Plates’ Cleaning
• Repair of Deformations
• Re-gasketing
• Hydrotesting
• Re-assembling
SUGGESTIONS & UPGRADES:
• 2 units of LT FW Coolers, consisted of 127pcs of titanium T0.5mm plates, were upgraded to 141pcs. Additional plates were manufactured in our production facilities.
• 2 units of Jacket HT Coolers, consisted of 92pcs of titanium T0.5mm plates, were upgraded to 104pcs. Additional plates were manufactured in our production facilities.
• 2 units of LO Coolers, were both equally equipped with 121pcs of new AISI T0.5mm plates, also manufactured in our production facilities.
After pressure testing, our technical personnel re-installed units back on vessel and our client’s lady was ready to sail once more.
Safe seas and fair winds!
Maritech Group Technical Department